Auger Boring Machine

Product Details
Customization: Available
After-sales Service: After-Service by Local Team
Warranty: 1 Year

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
15
Year of Establishment
2015-07-17
  • Auger Boring Machine
  • Auger Boring Machine
  • Auger Boring Machine
  • Auger Boring Machine
  • Auger Boring Machine
  • Auger Boring Machine
Find Similar Products

Basic Info.

Model NO.
BM800
Soil
Clay, Soil, Hard Soil
Pipe
Steel
Brand Name
Xuanxuan
Max. Torque
50000kn.M
Cylinder Thrust
2600kn
Rpm
25
Transport Package
Standard Export Packing
Specification
200-1600mm
Origin
Changzhou, Jiangsu, China
HS Code
8430313000
Production Capacity
120 Sets Per Year

Product Description


Auger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring Machine

 

Auger Boring Machine

Auger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring MachineAuger Boring Machine
Product Description

 

Pipe Jacking Machine construction is the Underground pipeline construction  which developped after   shield construction.   

It does not need require the excavation surface,And it can cross roads, railways, rivers, ground buildings, underground structures and various kinds of underground pipelines, etc.

With the help of the thrust of main cylinder and intermediate jacking station between the pipes and other thrust pushing the tool pipe or heading machine (through the soil )from working well to the receiving well and Lift up.At the same time,embed the pipes between the two wells ,In order to realize the non-excavated laying underground pipes. Avoid destruction of the city buildings  and road traffic congestion during construction

In the stability of soil and environmental protection highlights its advantages.It is very important for cities with heavy traffic, densely populated, with many terrestrial buildings and complex underground pipelines.It will create a clean, comfortable and beautiful environment for the city.

 

Application Scope:

Pipe Jacking Machine is also widely used in underground water pipe ,oil pipe ,nature gas ,for trechless underground pipe laying projects, eg. sewage, water supply, discharging projects, cables, tunnel,various communication cable laying pipeline trenchless, This technology doesn't need excavation surface ,it push the pipe to the soil begin with star shaft,and it can curve ,overcome some underground pipeline obstacles.  

 

Principle:

Pipe Jacking Machine construction is trenchless (non-excavation)construction, It is a non-excavation or less excavation of the pipeline embed construction technology.Pipe jacking construction is in the work in the pit by means of jacking equipment which produce jacking force, and overcome the friction between the pipes and the surrounding soil Jacking the pipes Into the soil at the design slope.and Removed soils, After a section of pipe finish jacking into the soil, then the second section of the pipes continue to jack into the soil, The principle is by means of the thrust of the main cylinder    pipeline, intermediate jacking station,and other thrust pushing the tool pipe or heading machine (through the soil )from working well to the receiving well and Lift up. Then, embed the pipes between the two wells

 

Our Services:

1. After sales services:overseas commissioning engineer available for testing and installation.

2. Working services:overseas commissioning working team for whole pipe jacking construction. 

3. On site service support;

4. 12month warranty;

5. Life time service support,

6. Communicate by Web services,WhatsApp, Phone, Email, Skype etc.

7. 7 days*24hours Hot-line & Email Service. 

8. Your inquiry related to our pipe jacking machine will be replied within 24 hours.Well-trained and experienced staff will answer all your questions in fluent English.

 

 Warranty:

If quality & assembling problem caused troubles, we take responsible on spare parts and all service fees.

If misuse or human factors caused the trouble, users shall take responsible on spare parts and all service fees.
 

Delivery Detail:
60 days after 30% deposit receiving


FAQ

In order for you to get a better price and technical solutions. Please provide the following required parameters:

1. Project total length, distance for one section, how many sections will be built? 

2. Pipe type: concrete or steel etc, pipe drawings

3. Projects information: for water supply, sewage project? 

4. Geological report

5. Construction drawings




 